Work
The Civiltek team has worked at mining and industrial sites across Canada and around the world.
Project Gallery
PILE INSTALLATION
CONSTRUCTION OF GRIZZLY
GRIZZLY INSTALLATION FINISHED PRODUCT
FUEL BAY INSTALLATION
THICKENER TANK FABRICATION
PASTE LINE CASING SURFACE TO UNDERGROUND INSTALLATION WEDGE CLAMP DESIGN
Tank Foundation Repair
TIMBERLAND WINCH INSTALLATION
THICKENER TANK REBAR INSTALLATION
PASTE PLANT BUFFER TANK COMPLETION
MILL THICKENER TANK COMPLETION
CABLE INSTALLATION
CYCLONE FEED PUMP BARREL FRAME REPLACEMENT
COMPLETE JAW CRUSHER CHANGE OUT
VX-3 LOUVERS INSTALLED IN NEWLY CONSTRUCTED WALL
GRANULATION COOLING TOWERS INSTALLATION
PASTE PLANT CONSTRUCTION
THICKENER TANK
ELECTRICAL SHAFT CABLE INSTALLATION
Pocket Demolition and Removal
Pocket Demolition and Removal
Underground Loading Pocket Installation
LOADING POCKET GIRDER BEAM PREFIT
Installation of Apron Feeder
Installation of Apron Feeder
Girder Beam Installation
Loading Pocket Install
New Pocket Installation Complete
APRON FEEDER – STRUCTURAL WORK PRIOR TO DEMOLITION
TRAIN LOADOUT – STRUCTURAL
APRON FEEDER REPLACEMENT
TRUCK DUMP – SHOTCRETE
ROCK GRIZZLY INSTALL
PASTE FILL BORE HOLE WELDING
PASTE FILL UPPER CASING INSTALL
HOIST ROPE – REMOVAL AND INSTALL
BELT LINE DEMOLITION AND INSTALLATION